Plastering done, kitchen carcases nearly all fitted, all upstairs architraves and skirtings fitted, new boiler in (but not running yet). Upstairs cupboards to be finished yet, worktops to be fitted, decorating still to do, utility to be fitted. Loos and basins to be fitted, plus most radiators. Electrician hopefully coming on Monday, along with plumber and joiners. The floorings are ordered and being fitted on 7th December. At some point, the outside space and the garden gate need to be sorted. Once I can get stuff into the kitchen cupboards, I think there may be more de-cluttering needed! For once, I can't wait! In one way or another, I think we've been a fairly active bunch! Andrea
|