What I want to know is why it takes 4 months to drill a 2000 foot, 2 foot wide shaft large enough to get these guys out... Seems something is wrong here... Seems that with the right eqipement they shoould be able to do at least 100 fett a day... That's not much... Heck, a 300 foot deep well can be drilled in lass than 2 days and that's thru stone???
Maybe I am missing something here???
No matter, I hope they all get out alive and can figure out how to find some peace in their lives after such an experience...