Wouldn't you know...not much sleep for me last night. I can't blame it entirely on the bright moon or the local coyotes, either. We awoke to 39F inside the camper. Please excuse me if I stumble.
So gnu- I guess we have decided the excavator is here so soon just to have it at the ready. No, the floor hasn't been framed yet. Yes, the foundation is still braced as it had to be for the foundation pouring (The three footings were poured at the same time.) They've left the scaffolding in place on the inside to help with the floor building. All around the exterior are the boards used to brace the outside. They will be removed before the water barrier is applied.