The Mudcat Café TM
Thread #134346   Message #3073263
Posted By: maeve
12-Jan-11 - 04:32 PM
Thread Name: BS: New Beginnings - new foundation (maeve & TL)
Subject: RE: BS: New Beginnings - new foundation (maeve & TL)
The electrical panel is in the basement. For the time being, we could wire if we chose to do so. We have enough to do without that, although we may do some of the interior wall wiring later on.

Stilly, that is one interesting table!