The Mudcat Café TM
Thread #136314   Message #3116160
Posted By: Q (Frank Staplin)
17-Mar-11 - 08:55 PM
Thread Name: BS: Japan Nuclear plant disaster, 2011
Subject: RE: BS: Nuclear plant disaster looming
Connecting of electrical cables hampered by radioactivity. Today (Friday in Japan) they will try to connect up number 2. Power expected to resume at 1 and 2 today.

Currently vapors rising from numbers 2 and 4 reactors. A panel blown out at no. 2 Thursday night.
(Water in storage pools should be 10 meters deep).
Water spraying will resume to no. 1 and 3 today when the government says it is safe. Some water remains at no. 4, it and no. 3 conditions most urgent.

Radiation is alpha to gamma, the steel plates on helicopters stop the gamma.
Neutron rays only released when there is "criticality," and that level not reached- not generated here.

The above from news releases by Tepco engineers a few minutes ago; not wholly coherent as I had trouble understanding the translation.

Defer to other people"- like the posters here?